50 kg 100-200 L Heavy Duty Washing Machine
In order to keep pace with the never-ending demands of customers, we are involved in offering a wide range of Heavy Duty Washing Machine.
In order to keep pace with the never-ending demands of customers, we are involved in offering a wide range of Heavy Duty Washing Machine.
Function Type | Semi-Automatic |
Loading Type | Top Loading |
Type | Semi Automatic |
Rated Capacity | 50 kg |
Drum Capacity | 100-200 L |
Motor Size | 5 HP |
Warranty (month) | 1 Year |
Voltage | 220 V |
Frequency | 50 Hz |
Power Source | Electric |
Material | Stainless Steel |
Weight | 10 to 50 Kg |
In order to keep pace with the never-ending demands of customers, we are involved in offering a wide range of Heavy Duty Washing Machine.
Yash Blast Abrasive blasting machine or Sand Blasting Machine can be fitted in variety of versions, with various kits and accessories, in order to meet exact requirement of the customer.
Yash blast abrasive machines are manufactured to the International standard and are used on production site through out the country. The machines comes in ready condition to be used, only a compress air connection to be priored. The medium used for Blasting is collected in the machine and can be used for many times and Exhaust Blowers provide at the top of the machine with filtering system to give clear Exhaust Air all models are equipment with concave head for easy filling, with automatic pop up valve. All vessels are tested at high pressure as per international standard the conical bottoms ensure and easy flow of abrasive to the metering valves. The inspection trap is period for access to the interior part of the vessels.
Details:
Capacity in liter |
Sand in kg |
Compressor |
H.P |
Working Pressure |
Line of pressure |
Suitable Nozzle |
¾”air hose |
½”Sand hose |
75 (portable) |
100-150kg |
50 CFM |
20 |
10kg/cm2 |
4-5 kg/cm2 |
4-5 mm |
15 mtr |
15 mtr |
125 (portable) |
200-300 kg |
75 CFM |
30 |
10 kg/cm2 |
4-5 kg/cm2 |
6-8 mm |
15 mtr |
15 mtr |
250(semi portable) |
400-700 kg |
200 CFM |
40 |
10 kg/cm2 |
4-5 kg/cm2 |
8-10 mm |
15 mtr |
15 mtr |
300 (semi portable) |
500 kg |
300 CFM |
100 |
10 kg/cm2 |
10-15 kg/cm2 |
10 mm |
15 mtr |
15 mtr |
Biochemistry Of Biogas Generation
The following three stages are involved in the process of anaerobic digestion.
In CSTR process the bacteria responsible for digestion process are kept in suspension with the help of Lateral as well as central mixers.
Process Description
Wastewater Transport
Raw effluent i.e. raw spent wash from the distillery shall be carried to treatment site through suitably designed channel or a closed pipe depending upon the topography of the site. Raw spent wash shall then be passed through heat exchanger [if required] to bring down the temperature to 38oC – 40oC raw spent wash. Pumps are installed to pump the raw effluent from buffer tank to reactor.
CSTR Reactor
The CSTR Reactor is designed on the principle of anaerobic contact process. The raw effluent enters the CSTR at the top in a central shaft. The Recirculated sludge is also mixed with raw effluent in a central shaft. A central agitator is provided at the top to facilitate mixing and downward movement of the mixed effluent. The effluent travels to the bottom of reactor through central shaft. In reactor the effluent comes in the contact with active anaerobic culture maintained in the suspension. In the process the organic matter in the effluent is converted in to biogas and cell mass. The liquid travels upward in the reactor. 6 Nos. of lateral agitators are provided for mixing and upward movement of the liquid.
The effluent is then taken out of the reactor through overflow pipe provided with water seal. The effluent will be received in a lamella clarifier where the active biomass will be separated and part of it is recirculated back to the reactor. Before entering into the lamella clarifier the effluent is passed through degassing tower for removal of dissolved gases to achieve better settling in the lamella clarifier. Lamella clarifier is fabricated with anticorrosive paint and is provided with inclined plates. The clarifier shall also be provided with sludge withdrawal arrangement. Sludge Recirculation pumps is provided to recirculate the sludge back to the CSTR reactor. The post anaerobic effluent is then taken to secondary treatment for further removal of the organics. CSTR reactor will be erected and fabricated at site using mild steel plates and structural members. The CSTR reactor will be rested on floating type foundation. The reactor will be painted from inside with chlorinated rubber paint and synthetic enamel paint from outside.
Biogas Recovery
Biogas will be collected at the top of the reactor and will be stored in a gasholder separately constructed. Biogas holder is fabricated in MS plated and shall be of floating type. Biogas from biogas holder will be compressed and sent to boiler for burning. Flare stack is provided to flare the excess biogas.
...
Delivering the latest product trends and industry news straight to your inbox
We’ll never share your email address with a third-party.